Ok people - can anyone take me how long it took to build the town centre?
nativebreed
Posts: 2
Joined: Thu Oct 12, 2017 11:34 am

Re: How long did it take to build the town centre?

Post by nativebreed »

2 years?
alvinfinch
Posts: 1
Joined: Fri Feb 09, 2018 12:23 am

Re: How long did it take to build the town centre?

Post by alvinfinch »

1996 – or maybe even before, but then things looked to be happening
Allied London Properties (backed by Schroders) and Legal & General both submitted multimillion-pound proposals to rebuild the town centre.
The press commented.
http://www.independent.co.uk/news/the-b ... 58734.html

Legal & General was proposing a 1.2 million sq ft shopping centre at the northern end of the town centre.
Allied London proposed a 650,000 sq ft scheme around Charles Square.
Legal & General had secured Marks & Spencer as an anchor tenant.
ALP had talked to Debenhams and House of Fraser.

2001 John Prescott said that both schemes were too big for Bracknell.

Reported on Getreading that a team of consultants are to prepare a fresh plan, supported by advice on viability and property issues, together with a retail study.
https://www.getreading.co.uk/news/local ... re-4277264

2002 - A £400 million masterplan to transform the heart of Bracknell is produced
https://www.getreading.co.uk/news/local ... ll-4275609
Some time goes by, and there is a recession and stuff.
People get worried, but we hung on in there, until:

2012 June - Planning permission for - Land Within Bracknell Town Centre Millennium Way Bracknell Berkshire Ref. No: 12/00476/OUT | Validated: Thu 07 Jun 2012 | Status: Approved (with Legal Agreement)
2014 Things had started to happen - Eventually we got to sort of start the building work, but something was not going quite right. Report from July 2014
https://www.getreading.co.uk/news/busin ... rk-7424090

2015 April - People start to get excited again - Construction teams are on the demolition site which used to be Broadway and Crossway in Bracknell town centre and have begun work to install 1,000 piles into the ground.
https://www.getreading.co.uk/news/local ... on-9143449

September 2017 we got there!
https://www.getreading.co.uk/news/readi ... l-13584797